• Petition filed by Solapur Bioenergy Systems Pvt. Ltd. - Case 65 of 2009 (Documents)
    - Advertisement Public Hearing in English
    - Advertisement Public Hearing in Marathi
    - Executive summary and SBSPL submittals to MERC in English
    - Executive Summary of Petition in Marathi
    - SBSPL Tarrif Sheet
• Encouraged by Ministry of Non-Conventional Energy Sources.
• Contract awarded by SMC through open competitive bidding.
• SPV for the project: Solapur Bio-Energy Systems Pvt Ltd.
• Process-Thermophillic Biomethanation.
• Project based on BOOT basis.
• Zero discharge concept.
• Operation for a period of 30 years.

Project Particulars
Award of Project Through open competitive bidding
Nature of Project Built Own Operate Transfer (BOT/BOOT)
Duration of Project 29 years 11 months
Project Capacity Processing of 300 TPD MSW
Technology Proposed Anaerobic Digestion
Typical expected yield from Project
Power Generation • Installed Capacity 2.83 MW
• Power Generation 2.47 MW
• Power available for Sale 2.00 MW
Compost Generation 45 TPD
Carbon Emission Reduction Certificate from Power Generation 15,300(30% of 51,000 p.a. (on Avg. for 10 years)
Implementation Time Frame 12 Months




Organic Waste India Pvt Ltd (OWIPL) is the SPV formed to execute the Municipal Solid Waste processing facility for Bruhath Bangalore Mahanagara Palike (BBMP) for setting up the project and then operating it for a period of 35 years.

Project Particulars
Special Purpose Vehicle Organic Waste India Pvt. Ltd.
Nature of Project Built Own Operate Transfer (BOT/BOOT)
Duration of Project 35 years
Project Capacity Processing of 1000 TPD MSW
Technology Proposed Anaerobic Digestion
Typical expected yield from Project
Power Generation • Installed Capacity 10 MW
• Power Generation 8.23 MW
• Power available for Sale 7 MW
Compost Generation 150 TPD
Carbon Emission Reduction Certificate from Power Generation 170000 p.a. (on Avg. for 10 years)
Implementation Time Frame 12 Months

 


 
 
   
   
   
   
   

 